Project consists of approximately 9,000 LF of water line and 2,000 LF of storm drain, and a 250,000 gallon glass fused water tank. Project entailed a steep dig up Cherry Heights hill requiring the use of a dozer for an anchor as an excavator dug the trench and climbed the hill backwards (see pictures).